Waterproofing & tanking · London
Bathroom Waterproofing & Tanking in London.
The hidden layer that decides whether your bathroom lasts ten years or leaks into the flat below. Primer, membrane, taped corners and bond-breaker treatment of the wet zone — done properly, photographed, then tiled.
- Full tankbefore any tile
- Photographedfor the client record
- £5Mpublic liability insured
Why tanking decides longevity
Waterproofing is the only stage of your bathroom you'll never see — and the only one that can ruin everything.
Most bathroom problems we get called to in London look like a tile issue, a grout issue or a silicone issue. They almost never are. The actual cause is usually a failed waterproofing layer behind the tile — a wet zone where the original installer skipped the corners, didn't tape the drain flange, didn't prime, or treated tanking as "optional" because the budget was tight.
Build Masters Group Ltd treats waterproofing and tanking as the foundation of every wet zone. It's either done properly with a system the manufacturer specified — or it's not done at all. There is no middle ground.
What "tanking properly" actually means
- Substrate prep — the wet zone surface is dry, level, free of dust and properly bonded before anything else.
- Primer — manufacturer-specified primer matched to the membrane and substrate, applied to coverage rate.
- Membrane — liquid or sheet membrane applied to the whole wet envelope (floor and lower walls) to the right thickness.
- Taped corners — internal corners, junctions and pipe penetrations sealed with reinforcement tape embedded in membrane.
- Bond-breaker at the drain — proper treatment of the drain flange so movement doesn't tear the membrane.
- Perimeter seal — splash-zone treatment up to a sensible height around the bath, basin and shower zone.
- Photo record — the finished tanking is photographed before tiling, so the client has documentation of what's behind the wall.
When you need standalone waterproofing (not as part of a renovation)
We are often called by London homeowners with a bathroom that's only a few years old where the shower is already leaking. Usually it's the membrane — sometimes there isn't one. The fix is to strip the affected zone, treat the substrate properly, install a new membrane, then re-tile and re-fit. It is more work than "patching", but patching over failed waterproofing rarely lasts and almost always returns.
Tanking as part of wetroom installation
If you are planning a new wetroom in London, tanking is automatically part of that scope — there is no separate decision. The same logic applies to a full bathroom renovation with a walk-in shower.
Related services
Tanking connects to the wider installation.
FAQ · Waterproofing & tanking
Waterproofing questions, answered.
What's the difference between waterproofing and tanking?+
In practice they describe the same job — making the bathroom substrate watertight before the visible finish (tile, panel) goes on. "Tanking" usually refers to the complete envelope treatment of a wet zone (wetroom or shower).
Do I need full bathroom tanking or just splash zones?+
It depends. A traditional bath with a separate shower screen often only needs splash-zone treatment. A wetroom, walk-in shower or open-plan ensuite needs a complete tank of the floor and lower walls. We assess this on the site visit.
Can you fix a bathroom where the existing waterproofing has failed?+
Yes. We strip the affected area back to substrate, dry it out, prime, apply a new membrane with taped corners, then re-tile. Patching over failed waterproofing rarely lasts.
Does your waterproofing come with photos?+
Yes — we photograph the tanking layer before tiling so the client has a record of the membrane, corners and drain treatment.
Which areas of London do you cover?+
We work across London including Islington, Angel, Hackney, Shoreditch, Camden, Clerkenwell and the wider North and Central London areas.
Protect your bathroom
Get bathroom waterproofing done properly the first time.
Free site visit. Membrane system matched to your wet zone. Photographed before tile goes on.